top of page

SAKARYA LOWER BASINS HYDROGEOLOGICAL SURVEY REPORT PROJECT

Administration : General Directorate of Water Management) and General Directorate of State Hydraulic Works

Employer  : Fugro Sial Geosciences and Engineering ltd. Sti.

 

Scope: Sampling, measurement /  analysis service and reporting of well and spring water samples within the scope of Sakarya Sub-Basin Hydrogeological Study Report Project.

 

The steps carried out within the scope of the project are given below.

 

Project steps:

​

1. Delivery of well and spring water  samples to the laboratory, which were measured/sampled by our laboratory for 4 periods during the work

2. Making analyzes according to the relevant parameter contents in the specification

3. Monitoring studies (well and spring water samples monitoring)

4. Preparation of analysis result reports within the scope of TÃœRKAK for Well and Spring waters

sakarya alt-1.png
sakarya alt-2.jpg
bottom of page