top of page

Our Main Projects

 

THE PREPARATION OF THE NORTH AEGEAN BASIN RIVER BASIN MANAGEMENT PLAN PROJECT

 

Administration: General Directorate of Water Management

Scope: Preparation of the North Aegean River Basin Management Plan for the protection and planning of surface waters and ground waters, including coastal waters, excluding seas, in a holistic approach in the North Aegean Basin. With the North Aegean River Basin Management Plan, it is aimed to bring all surface and groundwater in the basin to a good condition.

The steps taken within the scope of the project are given below.

Project steps:

1. Analysis of the current situation of the river basin

2. Identifying hot spots in terms of quality and quantity management

3. Conducting economic analysis studies at the stages of the current situation and measures program

4. Monitoring studies (surface and groundwater monitoring)

5. Setting environmental targets

6. Establishment of measures program

7. Preparation of Strategic Environmental Assessment report

8. Conducting GIS studies

9. Creating the River Basin Management Plan.

 

 

REFERENCE MONITORING NETWORK INSTALLATION OF TURKEY PROJECT

 

Administration: General Directorate of Water Management

Scope: river in 25 basins in Turkey, lakes, transitional waters and coastal waters Reference field and the aim of establishing the monitoring and evaluation of performed works reference monitoring network in 25 basins determine the reference point representing this area and to identify transitional water bodies in Turkey.

The steps taken within the scope of the project are given below.

Project steps:

1. Identifying candidate reference areas and monitoring these areas for 1 period

2. Determining potential reference areas according to the results of the monitoring and monitoring these areas for 2 more periods

3. Determining the final reference areas according to the monitoring results and establishing reference networks for each biological quality component

 

 

 

GÖKÇE DAM LAKE BASIN WATER QUALITY MONITORING REFERENCE POINTS DETERMINATION AND MODELING PROJECT

 

Administration: General Directorate of Water Management

Scope: Yalova province, within the boundaries of Termal district and Yalova province; Gökçe Dam Lake, from which drinking and utility water is supplied to the city center, Çınarcık, Çiftlikköy and Altınova districts, Ä°pek Kağıt Factory, Aksa Fiber Factory and Tersan Shipyard Facility, protect the water resources feeding the dam, and evaluate the characteristics of the source and the basin with scientific studies, Determining the social, economic, physical, geological, hydrogeological, hydromorphological, ecological and chemical characteristics of the Gökçe Dam Lake Basin based on scientific data in order to protect and improve the water quality and quantity of the Gökçe Dam Lake Basin based on scientific data. and Modeling ”work.

With the special provisions that emerged as a result of the assessment and implementation studies carried out in the project area, the current situation was determined and it was aimed to reduce the possible future adverse effects of the current situation and to protect the basin by improving the water quality with the studies carried out in the basin.

 

Project steps:

1. Analysis of the current situation of the basin

2. Identification of polluting sources (point and spread sources) that affect water quality

3. Determining the water quality of the basin (ground and surface water quality)

4. Preparation of the current pollution map

5. Evaluating and stating recommendations (description of pressures and effects)

6. Determining the necessary measures to be taken

7. Creating a Protection Plan.

 

BASIN MONITORING AND DETERMINATION OF REFERENCE POINTS PROJECT-SAKARYA RIVER BASIN

Administration: General Directorate of Water Management

Scope: Yalova province, within the boundaries of Termal district and Yalova province; Gökçe Dam Lake, from which drinking and utility water is supplied to the city center, Çınarcık, Çiftlikköy and Altınova districts, Ä°pek Kağıt Factory, Aksa Fiber Factory and Tersan Shipyard Facility, protect the water resources feeding the dam, and evaluate the characteristics of the source and the basin with scientific studies, Determining the social, economic, physical, geological, hydrogeological, hydromorphological, ecological and chemical characteristics of the Gökçe Dam Lake Basin based on scientific data in order to protect and improve the water quality and quantity of the Gökçe Dam Lake Basin based on scientific data. and Modeling ”work.

In the Sakarya River Basin, surface (river, lake, transitional water, coastal water) and ground waters, at points determined by the Abolished Ministry of Forestry and Water Affairs, Article 8, Annex of the Water Framework Directive (WFD) (2000/60 / EC) Within the scope of -5, the physico-chemical, chemical, biological and hydromorphological quality elements of the said water bodies were monitored observationally and data flow was obtained. The steps taken within the scope of the project are given below.

Project steps:

1. Water quality and water level are measured twice a year in groundwater, and water quality once a year and biological monitoring once a year in seasonal periods.

2. Monitoring of water 4 times a year and biological quality elements once a year in 3-month periods at coastal-crossing waters monitoring points,

3. Instant flow measurement at all monitoring points

4. Preserving the samples and transporting them to the laboratory and making physicochemical, chemical and biological analyzes,

5. The results of the analysis include SEA and Sister Directives, Water Pollution Control Regulation, Regulation on Quality of Surface Water Obtained and Planned to Be Obtained, Regulation on Protection of Ground Water Against Pollution and Degradation, Regulation on Control of Pollution Caused by Hazardous Substances in Water and its Environment Evaluation according to the Swimming Water Quality Regulation and other relevant legislation,

6. Creating Water Pollution Maps by transferring all collected data and evaluation results to the Geographical Information Systems (GIS) environment,

7. Preparing and submitting the obtained data and evaluation results to the Administration in 3-month periods as "Interim Reports".

 

BASIN MONITORING AND DETERMINATION OF REFERENCE POINTS PROJECT-GEDIZ RIVER BASIN

 

Administration: General Directorate of Water Management

Scope: Article 8 of the Water Framework Directive (WFD) (2000/60 / EC) at points determined by the Abrogated Ministry of Forestry and Water Affairs in the Gediz River Basin, surface (river, lake, transitional water, coastal water) and groundwater. Within the scope of Annex-5, the physicochemical, chemical, biological and hydromorphological quality elements of the mentioned water bodies were monitored observationally and the data flow was obtained.

The steps taken within the scope of the project are given below.

Project steps:

1.Measuring water quality and water level twice a year in groundwater, and biological monitoring 4 times a year and once a year in 3-month periods seasonally,

2. Monitoring of water and biological quality elements once a year, 4 times a year in 3-month periods, seasonally at coastal-transitional waters monitoring points,

3. Instant flow measurement during water and biological sampling at all monitoring points,

4. Preserving the samples and transporting them to the laboratory and making physicochemical, chemical and biological analyzes,

5. Water Framework Directive and Sister Directives, Water Pollution Control Regulation, Regulation on Quality of Surface Water Obtained and Planned to be Obtained Drinking Water, Regulation on Protection of Ground Water Against Pollution and Degradation, Control of Pollution Caused by Hazardous Substances in Water and its Environment Regulation, Swimming Water Quality Regulation and other relevant legislation,

6. Creating Water Pollution Maps by transferring all collected data and evaluation results to the Geographical Information Systems (GIS) environment,

7. The data obtained and the evaluation results are prepared in 3-month periods in the form of "Interim Reports" and submitted to the Administration.

 

 

WATER QUALITY MONITORING PROJECT IN AKARÇAY BASIN

 

Administration: General Directorate of State Hydraulic Works

Scope: Within the scope of Water Quality Monitoring Project in Akarçay Basin; Within the framework of the Basin Monitoring Program prepared in accordance with the requirements of the "Regulation on Monitoring of Surface and Groundwater" in the basin, the parameters that could not be analyzed by the General Directorate of State Hydraulic Works in accordance with the national legislation, and in accordance with the national legislation in river and lake waters, Taking samples from the surveillance monitoring and protected area monitoring points given within the scope of the project, measuring and analyzing the physicochemical and chemical, biological and hydromorphological parameters requested in the Technical Specification of the project, evaluating and reporting all monitoring results according to the relevant legislation, DSI SVT-Water Entering the Quality Module with its coordinates on basin basis, ensuring the transfer of data to this system via SVT in case the "National Water Information System" is activated, and determining the methods used / to be used for analysis, making improvements and validations (analysis techniques, development of in-laboratory analysis method) and determining whether infrastructure strengthening is required for the Administration and the Region according to the analysis results. In addition, thanks to the evaluation and implementation studies to be carried out within the scope of the project; It is aimed to determine the current status of the Administration and Regional infrastructures, to make short, medium and long term plans, to determine the vehicles, devices, consumables, tools and equipment that will / may be required in the following periods.

Project steps:

1. Defining the basin

2. Sampling and delivery to relevant administrations (DSI Regional Directorates and TAKK)

3. Conducting water quality monitoring studies in surveillance and protected areas (chemical monitoring)

4. Performing hydromorphological monitoring studies

5. Conducting biological (fish, macroinvertebrates, phytobentoses, phytoplankton and macrophytes) monitoring studies

6. Preparation of the current pollution map

7. Akarçay Basin water quality assessment and determination of quality classes.

 

 

 

WATER QUALITY MONITORING PROJECT IN YEŞİLIRAK BASIN

 

Administration: General Directorate of State Hydraulic Works

Scope: Within the scope of Water Quality Monitoring Project in Yeşilırmak Basin;

Within the framework of the Basin Monitoring Program prepared in accordance with the requirements of the "Regulation on Monitoring of Surface and Groundwater" in the basin, the parameters that could not be analyzed by the General Directorate of State Hydraulic Works in accordance with the national legislation, and for the analysis of all parameters in rivers, lakes and coastal waters in accordance with the national legislation, Taking samples from the surveillance monitoring and protected area monitoring points given within the scope of the project, measuring and analyzing the physicochemical and chemical, biological and hydromorphological parameters requested in the Technical Specification of the project, evaluating and reporting all monitoring results according to the relevant legislation, DSI SVT-Water Entering the Quality Module with its coordinates on basin basis, ensuring the transfer of data to this system via SVT in case the "National Water Information System" is activated, and determining the methods used / to be used for analysis, It is the determination of whether infrastructure strengthening is necessary for the Administration and the Region according to the analysis results (analysis techniques, development of in-laboratory analysis method). In addition, thanks to the evaluation and implementation studies to be carried out within the scope of the project; It is aimed to determine the current status of the Administration and Regional infrastructures, to make short, medium and long term plans, to determine the vehicles, devices, consumables, tools and equipment that will / may be required in the following periods.

Project steps:

1. Defining the basin

2. Sampling and delivery to relevant administrations (DSI Regional Directorates and TAKK)

3. Conducting water quality monitoring studies in surveillance and protected areas (chemical monitoring)

4. Performing hydromorphological monitoring studies

5. Conducting biological (fish, macroinvertebrates, phytobentoses, phytoplankton and macrophytes) monitoring studies

6. Preparation of the current pollution map

7. Evaluation of Yeşilırmak Basin water quality and determination of quality classes.

 

PREPARATION OF WATER QUALITY REPORT UNDER ISTANBUL POTABLE WATER AND SEWERAGE MASTER PLAN

 

 

Administration: Ä°SKÄ° Istanbul Water and Sewerage Administration

Employer: DOLSAR Mühendislik A. Åž.

Scope: Determining the water quality of existing and potential water resources and streams feeding the resources, evaluating the use of these resources and making suggestions for measures to improve their quality.

Within the scope of the study, Turkish and European Union Legislations were put forward; Previous studies were examined; The physical and socioeconomic characteristics of the project area were determined; Pollutant sources in drinking water sources were determined; General limnological characteristics of existing potable water reservoirs and water quality conditions and odor conditions determined by field studies are given. Water quality classes of existing and potential potable water resources have been determined according to the relevant legislation. In the report, recommendations for measures are presented to improve the condition of water resources or to maintain their good condition. In addition, recommendations were made on the establishment of a water quality monitoring program in existing and potential potable water resources.

 

ÇUBUK-2 AND KAVÅžAKKAYA DAM PROTECTION PLAN AND SPECIAL PROVISION DETERMINATION PROJECT

 

Administration: General Directorate of Ankara Water and Sewerage Administration

Scope: It is the arrangement of the plans for determining the protection areas and protection principles, and the procedures and principles regarding other works and procedures, taking into account the characteristics of Çubuk 2 and KavÅŸakkaya Potable Water Dam Basins.

With Çubuk 2-KavÅŸakkaya Dams Protection Plan and Special Provision Determination Project, it is aimed to protect and improve the water quality and quantity of the basins on the basis of the basin and to bring all surface and groundwater in the basin to a good condition.

The steps taken within the scope of the project are given below.

 

Project steps:

1. Determination of surface and underground monitoring stations

2. Monitoring of surface and ground water quality for a year

3. General characteristics of the basin and determination of the current pollution load

4. Conducting water quality modeling studies

5. Creating pollution maps and basin database

6. Determination of water quality based on current and projection years

7. Establishment of measures program

8. Protection Plan and Determination of Special Provisions.

 

 

 

BOTAÅž INTERNATIONAL LIMITED BAKU-TBILIS-CEYHAN CRUDE OIL PIPELINE PROJECT ENVIRONMENTAL MONITORING AND CONSULTANCY SERVICES

 

Administration: BOTAÅž International General Directorate

Scope: Within the scope of Baku-Tbilisi-Ceyhan Crude Oil Project, on the pipeline route; Pump stations in Ardahan, Erzurum, Erzincan and Sivas provinces (PT1, PT2, PT3 and PT4), pressure reduction and pig station (IPT1) in KahramanmaraÅŸ, pig station in Kars province (IPT2) and Ceyhan in Adana Monitoring water discharges and groundwater resources at the Marine Terminal (CMT) within the scope of operational period environmental monitoring and consultancy services.

 

 

Project steps:

1. Monthly sampling and analysis from oil-water separators located at the stations

2.Monthly sampling and analyzing wastewater treatment plants at the stations.

3. Monthly sampling and analysis from rainwater pools

4. Groundwater monitoring studies in four periods throughout the year

5. Preparing monthly reports for the results of the measurement and analysis studies carried out and submitting them to the employer.

6. Preparation of annual reports including evaluations and recommendations.

 

 

THE QUANTITY AND QUALITY CHARACTERISTICS OF UNDERGROUND WATERS IN BURDUR AND WESTERN MEDITERRANEAN BASIN PROJECT

 

Administration: General Directorate of Water Management and General Directorate of State Hydraulic Works

Employer: Fugro Sial Earth Sciences and Engineering LTD. ÅžTÄ°.

Scope: Measurement and analysis service and reporting of groundwater samples within the scope of Determining and Evaluating the Quantity and Quality Characteristics of Groundwater in Burdur and Western Mediterranean Basins.

The steps taken within the scope of the project are given below.

Project steps:

1.Delivery of groundwater samples measured / sampled by our laboratory for 4 periods during work to the laboratory

2. Analyzing the relevant parameter content in the specification

3. Monitoring studies (groundwater samples monitoring)

4. Preparation of underground water analysis results within the scope of TÜRKAK.

The steps taken within the scope of the project are given below.

 

 

EASTERN MEDITERRANEAN BASIN UNDERGROUND WATER PLANNING (HYDROGEOLOGICAL SURVEY) REPORT PROJECT

 

Administration: General Directorate of State Hydraulic Works, Geotechnical Services and Groundwater Department

Employer: Hidro Dizayn Mühendislik MüÅŸavirlik Ä°nÅŸaat ve Ticaret A.Åž.

Scope: Conducting a hydrogeological survey in the Eastern Mediterranean Basin and determining, characterizing and monitoring the groundwater bodies included in the Regulation on the Protection of Groundwater Against Pollution and Degradation.

The steps taken within the scope of the project are given below.

Project steps:

1.Delivery of the samples taken by the employer twice a year for 1 year to the laboratory

2. Analyzing the relevant parameter content in the specification

3. Monitoring studies (groundwater monitoring)

4. Preparation of TÜRKAK Scope / Out-of-scope analysis result reports for groundwater

 

KIZILIRAK BASIN UNDERGROUND WATER PLANNING (HYDROGEOLOGICAL SURVEY) REPORT PROJECT

 

 

Administration: General Directorate of State Hydraulic Works

Employer: Fugro Sial Earth Sciences and Engineering LTD. ÅžTÄ°.

 

Scope: Conducting a hydrogeological study in the Kızılırmak Basin and determining, characterizing and monitoring in terms of quality the groundwater bodies included in the regulation on the Protection of Groundwater Against Pollution and Degradation.

The steps taken within the scope of the project are given below.

Project steps:

Delivery of samples taken by the employer to the laboratory during 4 periods (September 2020-May 2022)

2. Analyzing the relevant parameter content in the specification

3. Monitoring studies (groundwater monitoring)

4. Preparation of TÜRKAK Scope / Out-of-scope analysis result reports for groundwater

 

MARMARA BASIN UNDERGROUND WATER PLANNING (HYDROGEOLOGICAL SURVEY) REPORT PROJECT

 

Administration: General Directorate of State Hydraulic Works, Geotechnical Services and Groundwater Department

Employer: NFB Mühendislik ve Danışmanlık A.Åž.

 

Scope: Conducting a hydrogeological survey in the Marmara Basin and determining the groundwater bodies included in the regulation on the Protection of Groundwater Against Pollution and Degradation, characterization and quality monitoring.

 

The steps taken within the scope of the project are given below.

 

Project steps:

1.Delivery of the samples taken by the employer twice a year for 1 year to the laboratory

2. Analyzing the relevant parameter content in the specification

3. Monitoring studies (groundwater monitoring)

4. Preparation of TÜRKAK Scope / Out-of-scope analysis result reports for groundwater

 

SAKARYA SUB-BASIN HYDROGEOLOGICAL STUDY REPORT PROJECT

 

Administration: General Directorate of Water Management) and General Directorate of State Hydraulic Works

Employer: Fugro Sial Earth Sciences and Engineering ltd. Åžti.

 

Scope: Sampling, measurement / analysis service and reporting of well and spring water samples within the scope of the Sakarya Sub-Basins Hydrogeological Survey Report Project.

 

The steps taken within the scope of the project are given below.

 

Project steps:

1. Delivery of well and spring water samples to the laboratory, which are measured / sampled by our laboratory for 4 periods during the work.

2. Analyzing the relevant parameter content in the specification

3. Monitoring studies (well and spring water samples monitoring)

4. Preparation of analysis result reports for wells and spring waters within the scope of TURKAK

 

SÖKE-AYDIN ​​SUB-BASIN GROUNDWATER PLANNING (HYDROGEOLOGICAL SURVEY) REPORT PROJECT

 

Administration: State Hydraulic Works 21st Regional Directorate

Employer: Hidro Dizayn Müh. MüÅŸ. Ä°nÅŸ. ve Tic. A.S.

 

Scope: It is the measurement and analysis of water samples taken from groundwater and surface waters and soil samples in Söke Aydın Sub-Basin.

 

The steps taken within the scope of the project are given below.

 

Project steps:

1. Delivery of water and soil samples taken by the employer twice a year for 4 periods during the work to the laboratory

2. Analyzing the relevant parameter content in the specification

3. Monitoring studies (underground, surface waters, rainwater and soil samples monitoring)

4. Preparation of underground water analysis results within the scope of TÜRKAK.

 

PROJECT OF EXPLOSION AND EVALUATION OF QUANTITY AND QUALITY CHARACTERISTICS OF UNDERGROUND WATERS IN YEŞİLIRAK BASIN

 

Administration: General Directorate of Water Management and General Directorate of State Hydraulic Works

Employer: Fugro Sial Earth Sciences and Engineering Ltd. Åžti.

 

Scope: Measurement and analysis service and reporting of groundwater samples within the scope of Determination and Evaluation of the Quantity and Quality Characteristics of Groundwater in Yeşilırmak Basin.

 

The steps taken within the scope of the project are given below.

 

Project steps:

1.Delivery of groundwater samples measured / sampled by our laboratory for 4 periods during work to the laboratory

2. Analyzing the relevant parameter content in the specification

3. Monitoring studies (groundwater samples monitoring)

4. Preparation of underground water analysis results within the scope of TÜRKAK.

bottom of page