SEFERÄ°HÄ°SAR HYBRID ENERGY

POWER PLANT (GPP+GES+RES) PROJECT

Water Quality Monitoring Project in the Eastern Black Sea Basin

 

In order to be used in the preparation of the Eastern Mediterranean Basin River Basin Management Plan, monitoring / analysis / reporting works will be carried out for the water quality and quantity of the basin.

 

The steps taken within the scope of the project are given below.

 

Project steps:

 

1. Sampling

2.Body Measurement

3. Analysis of Samples

4. Reports

 

Work has started within the scope of the project.