PLANNING
Master and Basin Planning
ÇINAR serves at the point of research to be carried out in order to meet the needs and expectations regarding the protection, development and sustainable use of our country's water basins and their natural resources, as well as the needs and expectations regarding ecological, economic, social and cultural benefits and services in the basins at a sufficient level and sustainably. gives. In this context, it has completed the "Çaltı Basin HEPP Projects Assessment Report on Basin Basin" project.
Water Quality and Biological Monitoring by Basin
ÇINAR, in basins surface (river, lake, transitional water, coastal water) and groundwater; Within the scope of the Water Framework Directive (WFD) (2000/60 / EC), it provides services to ensure data flow by monitoring the physico-chemical, chemical, biological and hydromorphological quality elements of the water bodies in question.
In this context, ÇINAR carried out Water Quality and Biological Monitoring studies within the scope of the Water Framework Directive in Sakarya and Gediz Basins, which it received from the General Directorate of Water Management.
Water Resources Management Planning
ÇINAR, in order to protect the natural values of our country; It carries out projects aimed at determining the potential of the existing surface and ground water resources in terms of quality and quantity in terms of quality and quantity of the existing surface and underground water resources of the regions, determining the existing problems, solving the problems and making the conservation usage decisions in order to meet the needs, based on the physical plans and projects planned by the relevant institutions.
In this context, it has successfully completed the "Tuzgölü Special Environmental Protection Area Water Resources Management Plan", which it received from the public service.
Water Rights Planning Report
ÇINAR prepares a planning report that reveals all the water rights in the project area according to the "HEPP Water Use Rights Disposition" determined by DSI for Hydroelectric Power Plant Projects and receives the approval of the relevant institution.
Not: Text in this page is translated from Turkish to English language via Google Translation Service