top of page

Water Quality Monitoring Project in the Eastern Black Sea Basin

 

In order to be used in the preparation of the Eastern Mediterranean Basin River Basin Management Plan, monitoring / analysis / reporting works will be carried out for the water quality and quantity of the basin.

 

The steps taken within the scope of the project are given below.

 

Project steps:

 

1. Sampling

2.Body Measurement

3. Analysis of Samples

4. Reports

 

Work has started within the scope of the project.

kuzey ege.png
kuzeyege2.png
bottom of page