MARMARA BASIN GROUNDWATER PLANNING (HYDROGEOLOGICAL SURVEY) REPORT PROJECT
Administration: General Directorate of State Hydraulic Works, Department of Geotechnical Services and Groundwater
Employer : NFB Mühendislik ve Müşavirlik A.Ş.
Scope: Hydrogeological survey in the Marmara Basin and determination, characterization and quality monitoring of groundwater bodies in the regulation on the Protection of Groundwater against Pollution and Deterioration.
The steps carried out within the scope of the project are given below.
Project steps:
1. Delivery of samples taken by the employer twice a year for 1 year to the laboratory
2. Making analyzes according to the relevant parameter contents in the specification
3. Monitoring studies (groundwater monitoring)
4. Preparation of TÜRKAK Scope/Out of Scope analysis results reports for groundwater


