top of page
Water Quality Monitoring Project in the Eastern Black Sea Basin
In order to be used in the preparation of the Eastern Mediterranean Basin River Basin Management Plan, monitoring / analysis / reporting works will be carried out for the water quality and quantity of the basin.
The steps taken within the scope of the project are given below.
Project steps:
1. Sampling
2.Body Measurement
3. Analysis of Samples
4. Reports
Work has started within the scope of the project.
1/1
bottom of page