top of page
Water Quality Monitoring Project in the Eastern Mediterranean Basin
In order to be used in the preparation of the Eastern Mediterranean Basin River Basin Management Plan, monitoring / analysis / reporting works will be carried out for the water quality and quantity of the basin.
The steps taken within the scope of the project are given below.
Project steps:
1. Sampling
2.Body Measurement
3. Analysis of Samples
4. Reports
Work has started within the scope of the project.
bottom of page