top of page

EAST MEDITERRANEAN BASIN GROUNDWATER PLANNING (HYDROGEOLOGICAL SURVEY) REPORT PROJECT

Administration: General Directorate of State Hydraulic Works, Department of Geotechnical Services and Groundwater

​

Employer : Hidro Dizayn Mühendislik Müşavirlik Ä°nÅŸaat ve Ticaret A.Åž.

​

Scope: Hydrogeological survey in the Eastern Mediterranean Basin and determination, characterization and quality monitoring of groundwater bodies included in the regulation on the Protection of Groundwaters Against Pollution and Deterioration.

The steps carried out within the scope of the project are given below.

​

Project steps:

​

1. Delivery of samples taken by the employer twice a year for 1 year to the laboratory

2. Making analyzes according to the relevant parameter contents in the specification

3. Monitoring studies (groundwater monitoring)

4. Preparation of TÃœRKAK Scope/Out of Scope analysis results reports for groundwater

1.png
2.png
3.jpg
bottom of page